Sale of Energy:

The project will generate 6612 million units of electrical energy in a 90% dependable year.

Besides providing 1500 MW of peaking power to the Northern Grid 12% of the power is to be supplied free of cost to the Himachal Pradesh and 25% of the remaining 88% of power generated, will be supplied to HP at the Bus Bar rates. The balance power available shall be distributed amongst the Northern Regional Grid States based on their actual energy consumption as well as the quantum of the central assistance to them in terms of the Gadgil formula.

To summarize the above:

  • Free power to HP : 12 percent
  • Power to HP at Bus Bar rate : 22 percent
Balance power available for the Northern Grid: 66 percent.

Sl. No. Year Actual Energy (Ex Bus) in MU Saleable Scheduled Energy            (Ex Bus) in MU
1. 2004-05 5108.776 4467.647
2. 2005-06 4055.169 3533.937
3. 2006-07 5942.307 5179.061
4. 2007-08 6385.337 5564.724
5. 2008-09 6547.679 5759.478
6. 2009-10 6956.849 6122.163
7. 2010-11 7078.684 6228.135
8. 2011-12 (Upto Sep-11) 5820.161 5116.752
 
   