Salient Features back
Capacity 252 MW
State/ Country Uttrakhand
Basin Pinder
Project Type Run of River
Type of Dam Gravity Concrete Dam
Height of Dam 35 m
FRL 1300 m
Nos. of Sluice Gates 2
Crest Level 1303 m
Length/ Dia of DT NA
No. of Intakes 1
Desilting Chambers Underground
No. of Adits 3
Length of HRT 17.903 KM
Dia of HRT 6.9 m
Discharge 120.75 Cumecs
Type of Surge Shaft Restricted Orifice
Height of Surge Shaft 78 m
Dia 21.5m
Type of Pressure Shaft Steel Lined
No. of Pressure Shaft(s)/ Penstocks 1
Type of Powerhouse Underground
No./ Capacity of generating units 3/84 MW
Type of Turbine/ No. Vertical Axis Francis
Gross Head 243.40 m
Design Head 230.42 m
Length/ dia of TRT/ Tail Race Tunnel 240m/8.5 mts
Energy in 90  % Dependable Year. 910.16 MU
Estimated cost 1375.75 Crore
   