| Capacity |
51 MW |
| State/ Country |
Uttrakhand |
| Basin |
Supin |
| Project Type |
Run of River |
| Type of Dam |
Barrage |
| Height of Dam |
13m |
| FRL |
1959.40 |
| Nos. of Sliuce Gates |
NA |
| Crest Level |
1963.50m |
| Length/ Dia of DT |
178m/ 1.65m diameter Steel pipes |
| No. of Intakes |
side intake |
| Desilting Chamber |
Undergroun, Twin Chamber 100 (L)x8(W)x12.37 (H) |
| No. of Adits |
3 |
| Length of HRT |
6.618 KM, Modified horse shoe shaped |
| Dia of HRT |
3.5 m (D shaped) |
| Discharge |
13.20 cum |
| Type of Surge Shaft |
Simple, Underground |
| Height of Surge Shaft |
38.67 Mts. |
| Dia |
25m |
| Type of Pressure Shaft |
Circular |
| No. of Pressure Shaft(s)/ Penstocks |
1/2 |
| Type of Powerhouse |
Underground |
| No./ Capacity of generating units |
2/25.5 MW |
| Type of Turbine/ No. |
Vertical pelton turbine |
| Gross Head |
445.80 m |
| Design Head |
435.43 m |
| Length/ dia of TRT/ Tail Race Tunnel |
150m/3.5 X 3.75 M (D Shaped) |
| Energy in 90 % Dependable Year. |
216.58 MU |
| Estimated cost |
451.28 Crore |