Choose Language:   Hindi  |  English
 
SEARCH

 

You do not have flash player installed.
Click Here to install latest Flash Player.

Home  -  Projects  -  Jakhol Sankri Project  -  Salient Features
 
   Introduction
  Salient Features
  Financing Details
  Important Events
  Progress Report
  Milestones
 
Nathpa Jhakri HEP
Rampur HEP
Luhri HEP
Devsari HEP
Naitwar Mori HEP
Jakhol Sankri HEP
Arun III HEP
Dhaulasidh HEP
Wangchu HEP
Kholongchu HEP
Tipaimukh HEP
 
Salient Features back
Capacity 51 MW
State/ Country Uttrakhand
Basin Supin
Project Type Run of River
Type of Dam Barrage
Height of Dam 13m
FRL 1959.40
Nos. of Sliuce Gates NA
Crest Level 1963.50m
Length/ Dia of DT 178m/ 1.65m diameter Steel pipes
No. of Intakes side intake
Desilting Chamber Undergroun, Twin Chamber 100 (L)x8(W)x12.37 (H)
No. of Adits 3
Length of HRT 6.618 KM, Modified horse shoe shaped
Dia of HRT 3.5 m (D shaped)
Discharge 13.20 cum
Type of Surge Shaft Simple, Underground
Height of Surge Shaft 38.67 Mts.
Dia 25m
Type of Pressure Shaft Circular
No. of Pressure Shaft(s)/ Penstocks 1/2
Type of Powerhouse Underground
No./ Capacity of generating units 2/25.5 MW
Type of Turbine/ No. Vertical pelton turbine
Gross Head 445.80 m
Design Head 435.43 m
Length/ dia of TRT/ Tail Race Tunnel 150m/3.5 X 3.75 M (D Shaped)
Energy in 90  % Dependable Year. 216.58 MU
Estimated cost 451.28 Crore
   
R&R Activities
Environmental Issues
Welfare Activities
Jakhol Sankri Hydro-electric Project Report