Choose Language:   Hindi  |  English
 
SEARCH

 

You do not have flash player installed.
Click Here to install latest Flash Player.

Home  -  Projects  -  Nathpa Jhakri Project  -  Salient Features
 
   Introduction
  Salient Features
  Project Benefits
  Important Events
  Progress Report
  Milestones
  Minimum Discharge
 
Nathpa Jhakri HEP
Rampur HEP
Luhri HEP
Devsari HEP
Naitwar Mori HEP
Jakhol Sankri HEP
Arun III HEP
Dhaulasidh HEP
Wangchu HEP
Kholongchu HEP
 
salient features back
The NJHEP project with an installed capacity of 1500 MW ( 6 X 250 MW ), envisaged construction of the following major components :
  • A 62.50 m. high concrete Dam on Satluj river at Nathpa to divert 486 cumecs of water through four Intakes.
     

  • An underground De-silting Complex, comprising four chambers, each 525 m. long, 16.31 m. wide and 27.5 m. deep, which is one of the largest underground complex for the generation of hydro - power in the World.
     

  • A 10.15 dia. and 27.394 km. long Head Race Tunnel, which is one of the longest hydro power tunnels in the World, terminating in a 21.60 m / 10.20 m dia and 301m deep Surge Shaft.
     

  • Three circular steel lined Pressure Shafts, each of 4.90 m dia and 571 m to 622 m length, each bifurcating into two near the Power House, to feed six generating units.
     

  • An underground Power House with a cavern size of 222 m x 20 m x 49 m having six Francis Turbine Units of 250 MW each, to utilize a design discharge of 405 cumecs and a design head of 428 m.
     

  • 6 nos. vertical axis Francis turbines Generating Units, each of 250 MW, with the total installed capacity as 1500 MW.
     

  • A 10.15 m dia and 982 m long Tail Race Tunnel to discharge the water back into the river Satluj.

   