SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 02.07.10 is 38611.407 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 02.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

36.718

37.222

36.876

70.298

73.184

74.046

73.394

2303.916

2478.154

2498.618

2477.857

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.295

6.226

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.190

6.136

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.053

5.989

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.268

6.224

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.180

6.110

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.236

6.191

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.222

36.876

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

731

Max. Dam Level

1495.85

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

388

Min. Dam Level

1493.00

Wangtoo

2729

8:00

1530

23:00

Water Spillage

-

Max. TRT Level

N/A

SFT

1240

10:00

1240

10:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1457

13:00

528

22:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

10

4