SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 05.07.10 is 38722.872 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 05.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

37.176

37.178

36.850

175.745

184.280

185.511

183.926

2409.363

2589.250

2610.083

2588.389

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.339

6.273

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.219

6.168

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.024

5.963

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.292

6.252

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.097

6.029

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.207

6.165

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.178

36.850

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

953

Max. Dam Level

1495.20

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

387

Min. Dam Level

1493.35

Wangtoo

2686

24:00

1392

20:00

Water Spillage

-

Max. TRT Level

1010.5

SFT

857

9:00

857

9:00

Water utilised for SFT flushing

-

Min. TRT Level

1010

Draft Tube

1182

22:00

768

13:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

20

5