NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 09.07.10 is 38870.786 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 09.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

36.211

37.163

36.904

316.341

331.223

333.425

330.692

2549.959

2736.193

2757.997

2735.155

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.161

6.117

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.239

6.204

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.048

5.997

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.300

6.269

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.174

6.109

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.241

6.208

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.163

36.904

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

843

Max. Dam Level

1495.20

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

387

Min. Dam Level

1489.95

Wangtoo

1830

17:00

1197

10:00

Water Spillage

375

Max. TRT Level

1010.5

SFT

1493

9:00

1493

9:00

Water utilised for SFT flushing

81

Min. TRT Level

1010.0

Draft Tube

2210

18:00

616

5:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

65

7