SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 18.07.10 is 39206.012 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 18.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

37.127

37.303

36.944

632.682

662.134

668.651

663.071

2866.300

3067.104

3093.223

3067.534

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.359

6.300

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.283

6.215

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.018

5.970

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.299

6.246

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.173

6.112

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.171

6.101

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.303

36.944

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1080

Max. Dam Level

1495.85

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

389

Min. Dam Level

1493.95

Wangtoo

4462

24:00

1901

10:00

Water Spillage

610

Max. TRT Level

1011.0

SFT

NA

NA

NA

NA

Water utilised for SFT flushing

81

Min. TRT Level

1010.0

Draft Tube

2443

6:00

1197

19:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

NA

NA

Draft Tube

61

6