SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 21.07.10 is 39278.215 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 21.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

36.944

37.305

37.070

738.128

734.831

740.854

734.720

2971.746

3139.801

3165.426

3139.183

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.203

6.171

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.197

6.171

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.125

6.082

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.301

6.274

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.209

6.143

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.270

6.229

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.305

37.070

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1230

Max. Dam Level

1495.80

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

389

Min. Dam Level

1493.65

Wangtoo

4119

4:00

2580

16:00

Water Spillage

760

Max. TRT Level

1011.5

SFT

NA

NA

NA

NA

Water utilised for SFT flushing

81

Min. TRT Level

1010.0

Draft Tube

2273

9:00

1651

17:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

NA

NA

Draft Tube

29

11