NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 22.07.10 is 39315.245 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 22.07.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

36.740

37.030

36.693

773.276

771.571

777.884

771.413

3006.894

3176.541

3202.456

3175.876

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.290

6.205

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.276

6.215

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.695

5.630

22:36

0:00:00

1:24:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.296

6.260

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.207

6.145

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.266

6.238

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.030

36.693

142:36

0:00:00

1:24:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1243

Max. Dam Level

1495.25

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

386

Min. Dam Level

1493.80

Wangtoo

3369

9:00

2404

21:00

Water Spillage

776

Max. TRT Level

1011.5

SFT

2067

19:00

1775

9:00

Water utilised for SFT flushing

81

Min. TRT Level

1011.0

Draft Tube

2044

15:00

1541

10:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

NA

NA

Draft Tube

28

8