NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 01.09.10 is 40063.068 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 01.09.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

28.257

37.516

37.543

37.216

28.257

37.516

37.5430

37.216

4441.091

3914.7161

3950.279

3917.450

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

6.384

6.310

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.304

6.252

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.228

6.170

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

5.945

5.911

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.382

6.312

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.300

6.261

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.543

37.216

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

823

Max. Dam Level

1495.35

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

391

Min. Dam Level

1494.00

Wangtoo

2670

24:00

1729

2:00

Water Spillage

351

Max. TRT Level

N/A

SFT

0

0:00

0

0:00

Water utilised for SFT flushing

81

Min. TRT Level

N/A

Draft Tube

1232

23:00

1015

7:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

NA

NA

Draft Tube

13

5