SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 02.09.10 is 40100.484 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 02.09.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

28.257

37.445

37.416

37.035

56.514

74.961

74.9590

74.251

4469.348

3952.1611

3987.695

3954.485

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

6.358

6.274

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.274

6.214

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.278

6.211

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

5.976

5.934

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.304

6.226

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.226

6.176

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

37.416

37.035

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

860

Max. Dam Level

1495.00

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

390

Min. Dam Level

1494.00

Wangtoo

2521

1:00

1812

0:00

Water Spillage

389

Max. TRT Level

N/A

SFT

1523

10:00

1523

10:00

Water utilised for SFT flushing

81

Min. TRT Level

N/A

Draft Tube

1476

22:00

1027

8:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

NA

NA

Draft Tube

14

5