NATHPA
JHAKRI HYDROELECTRIC POWER STATION
Total Power Generated till 06.09.2007
: 20526.2324MU
Year
2007–2008
( DAILY GENERATION REPORT FOR : 06.09.2007)
GENERATION DATA(MU)
| Daily | Monthly Cuml. | Yearly Cuml. | ||||||
| MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual |
| 29.772 | 35.568 | 35.887 | 178.632 | 213.408 | 215.500 | 4133.707 | 4262.299 | 4303.309 |
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage Due to Breakdown in M/C |
Misc. |
Availability |
||
| Reservoir flushing/ high silt | Less avail. of water | Grid Constraints etc | ||||||
| Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | ||
|
Unit-1 |
6.003 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-2 | 5.971 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-3 | 5.977 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-4 | 5.989 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-5 | 5.999 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-6 | 5.948 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Total | 35.887 | 144:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 144:00 |
HYDROLOGICAL DATA
|
Discharge for Generation Satluj & Sholding (Cumecs) |
Levels (Meters) |
SILT (PPM) |
||||||
|
Inflow for Generation |
456.00 |
Max. Dam Level |
1492.00 |
Max. |
at (H:m) |
Min. |
at (H:m) | |
|
Water Utilized |
374.00 |
Min. Dam Level |
1490.70 |
Wangtoo |
1610 | 11:00 | 1445 | 21:00 |
|
Water Spillage |
82.00 |
Max.TRT Level |
1007.00 |
SFT |
2360 | 20:00 | 1093 | 12:00 |
|
Min. Dam Level |
1007.00 |
Draft Tube |
865 | 9:00 | 590 | 21:00 | ||