NATHPA
JHAKRI HYDROELECTRIC POWER STATION
Total Power Generated till 07.09.2007
: 20560.6314MU
Year
2007–2008
( DAILY GENERATION REPORT FOR : 07.09.2007)
GENERATION DATA(MU)
| Daily | Monthly Cuml. | Yearly Cuml. | ||||||
| MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual |
| 29.772 | 34.144 | 34.399 | 208.404 | 247.552 | 249.899 | 4163.479 | 4296.443 | 4337.708 |
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage Due to Breakdown in M/C |
Misc. |
Availability |
||
| Reservoir flushing/ high silt | Less avail. of water | Grid Constraints etc | ||||||
| Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | ||
|
Unit-1 |
5.942 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-2 | 5.924 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-3 | 5.966 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-4 | 5.938 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-5 | 5.952 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-6 | 4.677 | 19:00 | 0:00 | 0:00 | 0:00 | 5:00 | 0:00 | 24:00 |
| Total | 34.399 | 139:00 | 0:00 | 0:00 | 0:00 | 5:00 | 0:00 | 144:00 |
HYDROLOGICAL DATA
|
Discharge for Generation Satluj & Sholding (Cumecs) |
Levels (Meters) |
SILT (PPM) |
||||||
|
Inflow for Generation |
345.00 |
Max. Dam Level |
1492.00 |
Max. |
at (H:m) |
Min. |
at (H:m) | |
|
Water Utilized |
345.00 |
Min. Dam Level |
1484.10 |
Wangtoo |
1531 | 17:00 | 1358 | 7:00 |
|
Water Spillage |
0.00 |
Max.TRT Level |
1007.00 |
SFT |
1987 | 4:00 | 1987 | 4:00 |
|
Min. Dam Level |
1007.00 |
Draft Tube |
1306 | 23:00 | 381 | 4:00 | ||