IIT, Patna
Load calculation on IOCL pipeline due to movement of loaded trucks (PCD-83/2024)
Load calculation on IOCL pipeline due to movement of loaded trucks (PCD-83/2024)
Procurement of ISAT Phone alongwith Docking Station and VHF Handset
Providing lease of 40 Mbps, 20Mbps internet connectivity at Palehi & Koyal Office locations respectively of LHEP-I for Two Years
Deputation of standby duty of One Water tender with Manpower from State Fire Service, Buxar, Bihar: Letter of Acceptance (LOA).
Conducting Biodiversity analysis of the study area of the project for 1x800 MW(Unit#3) of Buxar Thermal Power Project (PCD-95/2025)
Conducting study on Hydrology and Hydrogeology of the project site as well as the study area of the project for I x 800 MW (U nit#3) of Buxar Thermal Power Project
PPR 2779 Supply and Installation of Docking Stations for Satellite Phones Installed at NJHPS Nathpa Dam as per the detailed Technical specification and scope of work annexure 3 and 4 enclosed
Carrying out “Petrographic Tests of Silt” of (6x250 MW) NJHPS Jhakri for Two Years
3D Mapping of crack through borehole GPR and Seismic Tomography in the Dam Block -11 of LHEP-I
Conducting Compressive Strength, Poisson's Ratio and Deformation Modulus Tests on Concrete and Foundation Rock Core Samples extracted from dam block no. 11 of Luhri-1 HEP